Abstract
The investigations of the work cover the analysis of the existing haulage system and the relevant data recordings, which represent the main basis for the optimization. An analysis of the existing electronic data processing data, wheel loader data, payloadmeter data and truck data was performed. The total haulage system was digitized and with them a detailed calculation of the haulage roads and haulage costs of each bench, truck and loader was made. Finally improvements by introducing an intermediate ore stockpile was discussed, aiming towards a reduction of the interaction between the haulage of the open pit and the plant.
Translated title of the contribution | Investigation and optimization of the truck haulage system on the Steirischer Erzberg |
---|---|
Original language | German |
Supervisors/Advisors |
|
Award date | 30 Jun 2006 |
Publication status | Published - 2006 |
Bibliographical note
embargoed until nullKeywords
- truck haulage system Steirischer Erzberg Komatsu Caterpillar open pit wheel loader iron ore haulage haulage costs truck radio data