Abstract
Within this thesis the problems in the parts piping and instrumentation and burning system had to be analyzed. As a consequence solutions had to be developed and realized. Plant safety and degree of automation should be increased within the part of piping and instrumentation. The review of the functional description and emergency scenarios is combined with the modification of the piping and instrumentation. The burning system was optimized that way that a larger amount of material can be charged continuously into the reactor.
Translated title of the contribution | Optimization of the Flash-Reactor pilot plant focus burner system and Pipes- and Instrumentation |
---|---|
Original language | German |
Qualification | Dipl.-Ing. |
Supervisors/Advisors |
|
Award date | 22 Mar 2013 |
Publication status | Published - 2013 |
Bibliographical note
embargoed until 12-02-2018Keywords
- Reco dust
- Flash-Reaktor
- recycling